
Brackish-Water RO Skid
| Process | Brackish-water reverse osmosis |
| Recovery | 65 – 80 % |
| Membranes | Spiral-wound TFC |
High-efficiency seawater reverse-osmosis packages with energy-recovery devices and robust pre-filtration built for high-salinity source water — skidded, tested and delivered as one system.
Indicative technical data. Final selection follows a duty-point review against curves, media analysis and site conditions — send us the operating point and we will confirm the exact model, materials and trim.
| Process | Seawater reverse osmosis |
| Energy recovery | Pressure exchanger / turbo |
| Pre-treatment | Multimedia · cartridge · dosing |
| Recovery | 35 – 45 % |
| Delivery | Skid-mounted, factory tested |
Supplied and commissioned for coastal municipal duty.
Supplied and commissioned for resorts duty.
Supplied and commissioned for marine duty.
Supplied and commissioned for industrial duty.
Every item is supplied through the manufacturer's official channel. That is what makes traceable documentation, correct material certificates and long-term spare-part availability possible — and it is the difference between a genuine part and a convincing one.
| Sourcing | Authorised OEM channel, factory direct |
| Documentation | Test and material certificates on request (EN 10204 3.1 where applicable) |
| Selection | Duty-point review by qualified engineers before quotation |
| Installation | Installation, flushing and commissioning by trained technicians |
| Warranty | Backed manufacturer warranty with local after-sales support |
| Spares | Fast-moving items held locally; parts sourced against serial number |

| Process | Brackish-water reverse osmosis |
| Recovery | 65 – 80 % |
| Membranes | Spiral-wound TFC |

| Type | Recessed plate / membrane |
| Plate size | 630 – 1,500 mm |
| Cake dryness | 30 – 45 % DS (feed dependent) |

| Operation | Continuous solid–liquid separation |
| Bowl | SS 316 / duplex, tungsten protection |
| Capacity | 2 – 80 m³/h (application dependent) |

| Format | 20 ft / 40 ft ISO container |
| Process | MBBR / MBR / extended aeration |
| Capacity | 25 – 1,000 m³/day per train |
Send the duty, the medium and the site conditions. Our engineering team answers with a value-engineered proposal, not a catalogue.
Required fields are marked. We answer within one business day.